Proyectos de innovación

< Go back

TransZeroWaste

Project type

Circularity

Duration
2023 - 2026

Company
CELSA Barcelona

Key developments

De-oiling mill scale in a pilot magnetic separator (50 m³/h) combined with ceramic flat sheet membrane filtration (10 m³/h).

Direct reduction of the resulting de-oiled scale with H2, leveraging on HYMET Project, and introduction in EAF as DRX.

This project is co-funded by:

Partners

More information?

Contact us if you want more detailed information about this project.

Contact